The original sources
471 documents from 80 publishers. If you would rather read the originals than our assembly of them, start here. Each story’s list is in the order of its footnotes.
Chapter 1How it began
The birth of NASA 8
- 165 Years Ago: The National Aeronautics and Space Act of 1958 Creates NASA
- 2Sputnik and the Origins of the Space Age
- 3A Brief History of NASA
- 4Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 5National Aeronautics and Space Act of 1958 (Unamended)
- 6Explorer 1
- 7The Decision to Go to the Moon: President John F. Kennedy’s May 25, 1961 Speech before a Joint Session of Congress
- 8This Week in NASA History: ABMA Transferred to NASA, Creating Marshall Center—July 1, 1960
Mercury & Gemini 13
- 1In the Beginning: Project Mercury
- 2Project Mercury
- 3Mercury Crewed Flights Summary
- 4This New Ocean: A History of Project Mercury (NASA SP-4201)
- 5Project Gemini: Apollo’s Training Ground
- 6Gemini Pioneered the Technology Driving Today’s Exploration
- 755 Years Ago: Gemini VIII, the First Docking in Space
- 8Gemini IX and the Angry Alligator
- 955 Years Ago: Gemini XII Closes Out a Successful Program, Paves the Way for Apollo
- 10On the Shoulders of Titans: A History of Project Gemini (NASA SP-4203)
- 1155 Years Ago: Gemini X Soars to New Heights
- 12Gemini XI
- 13Project Mercury Overview: Summary
Apollo 8
- 1Apollo: A Retrospective Analysis (Monographs in Aerospace History 3)
- 2A Brief History of NASA
- 3The Apollo Program
- 4Apollo’s Lunar Module Bridged Technological Leap to the Moon
- 555 Years Ago: The Apollo 1 Fire and its Aftermath
- 6Chariots for Apollo: A History of Manned Lunar Spacecraft (NASA SP-4205)
- 7Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 8NASA’s Artemis II Crew Eclipses Record for Farthest Human Spaceflight
The Space Shuttle 15
- 1Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 2The Space Shuttle Decision: NASA’s Search for a Reusable Space Vehicle (NASA SP-4221)
- 3The Flight of STS-1
- 4The Space Shuttle (reference)
- 5Space Shuttle
- 6Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. IV: The Cause of the Accident
- 7Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. V: The Contributing Cause of the Accident
- 8Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. VI: An Accident Rooted in History
- 9Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. VIII: Pressures on the System
- 10Columbia Accident Investigation Board Synopsis
- 1120 Years Ago: Remembering Columbia and Her Crew
- 12STS-135: The Final Voyage
- 13A Brief History of NASA
- 14Flights of Atlantis (OV-104) (NASA Facts FS-2011-06-135-KSC)
- 15Space Shuttle Missions (mission index)
Chapter 2Getting to orbit
How rockets reach orbit 15
- 1Flight to Orbit
- 2Rocket Thrust
- 3Specific Impulse
- 4Ideal Rocket Equation
- 5Mass Ratios
- 6Booster Staging Interactive
- 7Structural System
- 8Rockets: Educator’s Guide with Activities in Science, Technology, Engineering, and Mathematics (MSFC-12-2025-SLS-5576)
- 9Basics of Space Flight, Chapter 14: Launch (including ‘Perspective: Launch Mass’ by Kevin Peter Hand, from Alien Oceans, Princeton University Press, 2020)
- 10NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 11Space Launch System (reference guide)
- 12Main Engine Cuts Off, Falcon 9 First Stage Separates (SpaceX CRS-24 launch blog)
- 13As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon
- 14Blue Origin launches third New Glenn rocket, but payload ends up in wrong orbit
- 15Vulcan
Falcon 9 16
- 1Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA/SP-2014-617)
- 2NASA Independent Review Team: SpaceX CRS-7 Accident Investigation Report (Public Summary)
- 3Audit of Commercial Resupply Services to the International Space Station (IG-18-016)
- 4NASA Commercial Crew Program: Plan Needed to Ensure Uninterrupted Access to the International Space Station (GAO-18-476)
- 5NASA Certifies First Commercial Human Spaceflight System
- 6NASA’s Commercial Crew Program Faces Schedule Delays, Cost Increases, and Safety Challenges
- 7NASA Awards SpaceX Three Crew Flights to Space Station
- 8NASA’s SpaceX Crew-13 Launches to International Space Station
- 9General Catalog of Artificial Space Objects: launch list
- 10NASA Set to Launch Second Commercial Crew Rotation to the International Space Station Live Shots
- 11Falcon 9
- 12SpaceX launches Starlink mission on a Falcon booster’s record-breaking 37th flight
- 13Main Engine Cuts Off, Falcon 9 First Stage Separates (SpaceX CRS-24 launch blog)
- 14NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon
- 15Falcon 9 Landing Following NASA’s SpaceX Crew-13 Launch (image release)
- 16Mission
Starship 17
- 1NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 2NASA: Assessments of Major Projects (GAO-26-108556)
- 3As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon
- 4SpaceX Completes Engine Tests for NASA’s Artemis III Moon Lander
- 5SpaceX Starship Hot Staging — From Concept to Flight
- 6How NASA’s Artemis III Lander Test Will Pave Way for Moon Landings
- 7SpaceX Starship Super Heavy Project at the Boca Chica Launch Site (project, history and vehicle pages)
- 8General Catalog of Artificial Space Objects: launch list
- 9Starship
- 10Super Heavy-Starship rocket chalks up mostly successful test flight
- 11Starship returns to Earth; rocket splashes down north of Hawaii after three-hour flight
- 12SpaceX launches Starship into orbit for 1st time—largest rocket ever built notches key milestone on dramatic Flight 14 test
- 13Starship Achieves Orbit for the First Time
- 14NASA Adds Mission to Artemis Lunar Program, Updates Architecture
- 15NASA, SpaceX Advance Wind Tunnel Tests at NASA Ames (image release)
- 16NASA Marshall Thermal Engineering Lab Provides Key Insight to Human Landing System (image release)
- 17Starship Flight 6 seen from the International Space Station (iss072e220043)
Space Launch System 10
- 1National Aeronautics and Space Administration Authorization Act of 2010 (Public Law 111-267), Section 302
- 2NASA’s Management of Space Launch System Program Costs and Contracts (IG-20-012)
- 3NASA’s Management of the Artemis Missions (IG-22-003)
- 4NASA’s Management of the Space Launch System Booster and Engine Contracts (IG-23-015)
- 5NASA’s Management of Space Launch System Block 1B Development (IG-24-015)
- 6NASA: Assessments of Major Projects (GAO-26-108556)
- 7Space Launch System (reference guide)
- 8NASA Adds Mission to Artemis Lunar Program, Updates Architecture
- 9NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth
- 10Artemis III Core Stage Arrival at VAB (image release)
New Glenn & Vulcan 20
- 1Vulcan
- 2Basics of Space Flight, Chapter 14: Launch
- 3General Catalog of Artificial Space Objects: launch list
- 4CLPS Peregrine Mission One (PM-1) Astrobotic/ULA Liftoff (image release)
- 5Vulcan suffers solid rocket booster problem during USSF-87 launch
- 6Space Force won’t launch Vulcan rockets until booster problem solved (Orlando Sentinel)
- 7Space Force weighs Vulcan flights without solid boosters
- 8ULA confirms successful solid rocket booster test as Vulcan anomaly investigation continues
- 9NASA, Blue Origin Launch Two Spacecraft to Study Mars, Solar Wind
- 10Blue Origin launches third New Glenn rocket, but payload ends up in wrong orbit
- 11Blue Origin’s New Glenn rocket explodes during prelaunch testing at Cape Canaveral
- 12Blue Origin identifies engine issue behind New Glenn explosion
- 13Administrator Isaacman Visits Blue Origin (image releases)
- 14NASA Adds Blue Origin New Glenn 9×4 to Launch Services Contract
- 15U.S. Space Force awards $13.7 billion in new national security launch contracts to Blue Origin, SpaceX and ULA
- 16NASA: Assessments of Major Projects (GAO-26-108556)
- 17How NASA’s Artemis III Lander Test Will Pave Way for Moon Landings
- 18NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 19NASA Selects Blue Origin as Second Artemis Lunar Lander Provider
- 20Space Force to review Vulcan commercial flights before clearing military missions
Spaceports 13
- 1Moonport: A History of Apollo Launch Facilities and Operations (NASA SP-4204)
- 2Basics of Space Flight, Chapter 14: Launch
- 3The Crawlers
- 4Launch Complex 39B (fact sheet FS-2021-08-726-KSC)
- 5NASA Signs Agreement with SpaceX for Use of Historic Launch Pad
- 6NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon
- 7SpaceX Starship Super Heavy Project at the Boca Chica Launch Site (project, history and operations pages)
- 8Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA/SP-2014-617)
- 9General Catalog of Artificial Space Objects: launch list
- 10NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 11Artemis II rollout and Vehicle Assembly Building (image releases)
- 12Artemis III Crew Visits Launch Complex 39A (image release)
- 13Falcon 9 Landing Following NASA’s SpaceX Crew-13 Launch (image release)
Chapter 3Living in orbit
ISS 15
- 1International Space Station (encyclopedia entry)
- 2ISS20th: High-Flying Construction
- 3International Space Station Facts and Figures
- 4The International Space Station Marks 25 Years of Continuous Human Presence
- 5NASA’s Management of Risks to Sustaining ISS Operations through 2030 (IG-24-020)
- 6NASA Provides Update on Space Station Leak
- 7Russia Agrees to ISS Operations, Seat-Swaps, Through 2030
- 8International Space Station Deorbit Analysis Summary
- 9NASA Selects International Space Station US Deorbit Vehicle
- 10United States Deorbit Vehicle (procurement summary)
- 11NASA: ISS Deorbit Vehicle Will Cost $1.5 Billion, but It’s Essential
- 12Low-Earth Orbit: NASA Faces Impending Decisions for Replacing International Space Station with Commercial Stations (GAO-26-107805)
- 13NASA’s SpaceX Crew-13 Launches to International Space Station
- 14NASA Appropriations and Authorizations: At a Glance (R43419)
- 15NASA’s Management of Its Commercial Crew Program (IG-26-011)
Life in orbit 30
- 1NASA’s SpaceX Crew-13 Launches to International Space Station (release 26-081)
- 2Station Prepares to Welcome Crew-13 while Continuing Space Research
- 3Advanced Health Research Begins Week as Station Awaits Crew-13 Mission
- 4Spacesuits, Exercise, and Cargo Ops Wrap Week Aboard Station
- 5The International Space Station Marks 25 Years of Continuous Human Presence
- 6Top Things to Know about Space Station Crew Handovers
- 7Seven Ways Astronauts Improve Sleep May Help You Snooze Better on Earth
- 8Food on the International Space Station
- 9The Real Story About Astronaut Health Care in Space
- 10Counteracting Bone and Muscle Loss in Microgravity
- 11Risk of Reduced Cardiorespiratory and Musculoskeletal Fitness
- 12NASA Achieves Water Recovery Milestone on International Space Station
- 13Boldly Go! NASA’s New Space Toilet Offers More Comfort, Improved Efficiency for Deep Space Missions
- 14Houston We Have a Podcast, Episode 144: Space Hygiene
- 15Mental Well-Being in Space
- 16Growing Plants in Space
- 17Microgravity Science Glovebox (MSG)
- 18Astronauts Complete Spacewalk for Solar Array Modifications
- 19NASA, ESA Astronauts Wrap Up Station Spacewalk
- 20ESA, NASA Astronauts Complete Navigation and Science Spacewalk Outside Station
- 21Expedition 75 is Go for Tuesday’s Navigation and Science Maintenance Spacewalk
- 22Station Crew Cleans Up, Relaxes After Busy Month of Spacewalks
- 23NASA Astronauts Ready for Thursday Spacewalk
- 24NASA’s Acquisition of Next-Generation Spacesuit Services (IG-26-006)
- 25Low-Earth Orbit: NASA Faces Impending Decisions for Replacing International Space Station with Commercial Stations (GAO-26-107805)
- 26Fact Sheet: NASA Unveils Transformative Initiatives to Achieve America’s National Space Policy (Ignition)
- 27Week Ends With Soldering, Lunar Simulations, and Cargo Mission Preps
- 28Crew Biology Research, Spacecraft Cargo Jobs Kick Off Week on Station
- 29Living and Working in Space (fact sheet)
- 30NASA, ESA Spacewalkers Finish Installing High-Speed Antenna
Commercial crew 13
- 1NASA’s Management of Its Commercial Crew Program (IG-26-011)
- 2NASA Chooses American Companies to Transport U.S. Astronauts to International Space Station
- 3NASA’s Management of Crew Transportation to the International Space Station (IG-20-005)
- 4NASA’s Commercial Crew Program: Update on Development and Certification Efforts (IG-16-028)
- 5Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA SP-2014-617)
- 6NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon
- 7The International Space Station Marks 25 Years of Continuous Human Presence
- 8NASA Releases Report on Starliner Crewed Flight Test Investigation
- 9NASA, Boeing Modify Commercial Crew Contract
- 10NASA, Boeing Share Update on Commercial Starliner Development Plans
- 11NASA plans unpiloted Starliner test flight at end of year
- 12NASA Awards SpaceX Three Crew Flights to Space Station
- 13NASA’s SpaceX Crew-13 Launches to International Space Station
Commercial stations 34
- 1Low-Earth Orbit: NASA Faces Impending Decisions for Replacing International Space Station with Commercial Stations (GAO-26-107805)
- 2NASA Selects First Commercial Destination Module for International Space Station
- 3NASA Selects Companies to Develop Commercial Destinations in Space
- 4NASA Partners Combine Efforts for Low Earth Orbit Commercial Station
- 5NASA Adjusts Agreements to Benefit Commercial Station Development
- 6NASA, Axiom Space Change Assembly Order of Commercial Space Station
- 7Axiom Space Adjusts Space Station Plans
- 8Q&A: Axiom’s Peggy Whitson on space station assembly
- 9NASA Sees Key Progress on Starlab Commercial Space Station
- 10Starlab Completes NASA Commercial Critical Design Review
- 11NASA Supports Burst Test for Orbital Reef Commercial Space Station
- 12NASA Sees Progress on Blue Origin’s Orbital Reef Design Development
- 13NASA Helps with Progress on Vast’s Haven-1 Commercial Space Station
- 14Vast Announces the Haven-1 and Vast-1 Missions
- 15Vast Secures Agreement with NASA to Test Haven-1 Flight Vehicle at Armstrong Test Facility
- 16Vast Advances Haven-1 Into Integration Phase
- 17Vast Secures $500M in Funding to Accelerate Production of Haven Space Stations
- 18Vast Selected by NASA for Sixth Private Astronaut Mission to International Space Station
- 19Directive on Revised Commercial Low Earth Orbit (LEO) Destinations (CLD) Phase 2 Acquisition Strategy
- 20NASA Seeks Industry Input on Next Phase of Commercial Space Stations
- 21Fact Sheet: NASA Unveils Transformative Initiatives to Achieve America’s National Space Policy (Ignition)
- 22NASA Changes Course on Commercial Space Stations
- 23NASA Agrees with Industry, Keep CLD Program As Is
- 24NASA Seeks Industry Input on Second Phase of Commercial Space Stations
- 25Commercial Low Earth Orbit (LEO) Destination Contract (CLDC): acquisition page and milestone schedule
- 26NASA Appropriations and Authorizations: At a Glance (R43419)
- 27NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2021 request)
- 28NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2022 request)
- 29NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2024 and FY2025 request)
- 30NASA Appropriations and Authorizations: Fact Sheet (R43419, FY2025 request)
- 31House Appropriators Reject Deep Cuts to NASA in FY2027
- 32NASA’s Management of Risks to Sustaining ISS Operations through 2030 (IG-24-020)
- 33Proposed fiscal 2027 funding could support two commercial space stations, developers say
- 34NASA Provides Update on Space Station Leak
Chapter 4Serving Earth
Orbits 18
- 1Catalog of Earth Satellite Orbits
- 2Station Facts
- 3NASA’s SpaceX Crew-13 Launches to International Space Station (release 26-081)
- 4Landsat 9
- 5Aqua Satellite and MODIS Swath
- 6Space Segment
- 7Geostationary Satellites (NOAA’s GOES-R Series)
- 8Why Do Satellites Have Different Orbits?
- 9Tracking and Data Relay Satellites
- 10What is a Lagrange Point?
- 11DSCOVR: Deep Space Climate Observatory
- 12Space Weather Observations at L1 to Advance Readiness (SOLAR-1)
- 13SOHO (Solar and Heliospheric Observatory)
- 14IMAP Arrives at L1
- 15Webb’s Orbit
- 16Roman Launches and a New Era Begins (Official NASA Recap)
- 17Frequently Asked Questions
- 18A reddish airglow blankets Earth beneath the Milky Way (iss073e0982696)
GPS 24
- 1GPS
- 2Space Segment
- 3U.S. Space Force delivers final GPS III to orbit, advancing its most resilient constellation for military, civil capabilities
- 4Satellite Navigation – GPS – How It Works
- 5The Global Positioning System (Global Positioning Tutorial)
- 6GPS and Telling Time
- 7GPS Timing and Precision Instruments
- 8GPS Accuracy
- 9Control Segment
- 10Global Positioning System (fact sheet)
- 11GPS
- 12New Civil Signals
- 13GPS Modernization
- 14GPS: Actions Needed to Address Ground System Development Problems and User Equipment Production Readiness (GAO-15-657)
- 15Global Positioning System: Better Planning and Coordination Needed to Improve Prospects for Fielding Modernized Capability (GAO-18-74)
- 16GPS Modernization: Delays Continue in Delivering More Secure Capability for the Warfighter (GAO-24-106841)
- 17Weapon Systems Annual Assessment: DOD Leaders Should Ensure That Newer Programs Are Structured for Speed and Innovation (GAO-25-107569): GPS IIIF and OCX
- 18Weapon Systems Annual Assessment: Requiring Mature Technologies Could Enable Shift to Rapid Delivery (GAO-26-108457): GPS IIIF and OCX
- 19Space Force kills OCX GPS ground control system, citing ‘insurmountable’ challenges
- 20Weapon Systems Annual Assessment: Updated Program Oversight Approach Needed (GAO-21-222): GPS III Follow-On
- 21Program Acquisition Cost by Weapon System, FY2020–FY2027 budget requests: Global Positioning System Enterprise
- 22Program Funding
- 23What Can GPS Do?
- 24DOC Study on Economic Benefits of GPS
Weather satellites 23
- 1How NOAA Satellites Help Us Stay Ahead of Severe Weather Season
- 2NOAA’s GOES-R Series (Geostationary Satellites)
- 3Celebrating 50 Years of GOES
- 4Advanced Baseline Imager (ABI)
- 5Hurricane Milton Eyes Florida
- 6Geostationary Lightning Mapper (GLM)
- 7NASA, SpaceX Launch NOAA’s Latest Weather Satellite
- 8NOAA’s GOES-19 Now Operational as GOES East, Providing Critical New Data to Forecasters
- 9Budget Estimates, Fiscal Year 2027: Congressional Justification (NESDIS chapters)
- 10Joint Polar Satellite System
- 11NASA Awards Launch Services Contract for NOAA’s JPSS-4 Mission
- 12Hurricane Beryl Brings Massive Power Outages to East Texas
- 13Hurricane Milton (GOES-16, NOAA-20 and NOAA-21 imagery)
- 14NOAA’s SOLAR-1 enters new era of space weather monitoring
- 15NOAA satellites helped rescue 300 people in 2025
- 16NOAA’s Geostationary Extended Observations (GeoXO) Satellite Program and Issues for Congress (R49026)
- 17Near Earth Orbit Network (NEON)
- 18NASA Selects Launch Provider for New NOAA Environmental Satellite
- 19NOAA Announces New Awards totaling $67M to Purchase Operational Commercial Data to Enhance Weather Forecasts and Space Weather Monitoring
- 20National Oceanic and Atmospheric Administration (NOAA) FY2027 Budget Request and Appropriations (IF13275)
- 21Hearing charter: A Review of the President’s Fiscal Year 2027 Budget Request for the National Oceanic and Atmospheric Administration
- 22Commerce, Justice, Science, and Related Agencies Appropriations Bill, 2027 (H. Rept. 119-652)
- 23House Clears FY2027 CR, Now to the President
Landsat 25
- 1Landsat
- 2Mission Success! Celebrating Landsat 9’s Five-Year Design Life Milestone
- 350+ years of Landsat: Las Vegas
- 4How Early Astronaut Photographs Inspired the Landsat Program
- 5Landsat 1
- 6Open Data
- 7Landsat Missions (with the Landsat 2, 3, 4 and 8 mission pages)
- 8Landsat 5
- 9Landsat 6
- 10A Final Farewell to Landsat 7
- 11Landsat 9
- 12Landsat, What’s Next? (IN12281)
- 13Landsat 9 and the Future of the Sustainable Land Imaging Program (R46560)
- 14A Landsat Milestone: One Hundred Million Downloads
- 15Free, Open Landsat Data Unleashed the Power of Remote Sensing a Decade Ago
- 16Opening Landsat Archive Helped Realize Its True Value
- 17Budget Justifications and Performance Information, Fiscal Year 2027: U.S. Geological Survey
- 18Mount Saint Helens Recovery
- 19Landsat 10
- 20Released: NASA Goddard Issues Draft Request for Proposal for the Landsat 10 Spacecraft
- 21NASA Releases Landsat 10 Spacecraft Request for Proposal
- 22The U.S. Geological Survey (USGS): FY2027 Budget Request (IF13205)
- 23Commerce, Justice, Science, and Related Agencies Appropriations Bill, 2027 (H. Rept. 119-652)
- 24House Clears FY2027 CR, Now to the President
- 25Devastation and Recovery of Mt. St. Helens
Chapter 5Return to the Moon
The Artemis plan 29
- 1NASA Administrator Statement on Return to Moon in Next Five Years
- 2NASA’s Lunar Exploration Program Overview (the Artemis Plan)
- 3NASA’s Management of the Artemis Missions, IG-22-003
- 4NASA Outlines Challenges, Progress for Artemis Moon Missions
- 5As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon
- 6NASA Selects Blue Origin as Second Artemis Lunar Lander Provider
- 7NASA Shares Progress Toward Early Artemis Moon Missions with Crew
- 8NASA Shares Orion Heat Shield Findings, Updates Artemis Moon Missions
- 9NASA’s Management of the Human Landing System Contracts, IG-26-004
- 10NASA Adds Mission to Artemis Lunar Program, Updates Architecture
- 11NASA Strengthens Artemis: Adds Mission, Refines Overall Architecture
- 12NASA Charts More Reliable Course for America’s Return to Lunar Surface (Going Back to the Moon fact sheet)
- 13NASA Unveils Initiatives to Achieve America’s National Space Policy
- 14Ignition
- 15NASA outlines ambitious $20 billion plan for moon base
- 16Spacesuit Development Delays Could Impact Artemis Timeline and ISS Operations
- 17Artemis IV
- 18Artemis II Press Kit
- 19NASA Marches Toward Artemis III Mission in 2027, Names Crew Members
- 20How NASA’s Artemis III Lander Test Will Pave Way for Moon Landings
- 21NASA: Assessments of Major Projects, GAO-26-108556
- 22NASA Joins Artemis III Orion Modules; Rocket Hardware Update
- 23NASA Starts Artemis III Engine Install; Boosters, Crew Training Advance
- 24NASA Provides Updates on Moon Base Cargo Landers, Tech Demonstrations
- 25“Lengthy Note” From Jared Isaacman To NASA (the Administrator’s memo of September 20, 2026)
- 26Starship reaches orbit on 14th test flight
- 27NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth
- 28Returning to the Moon (presentation by Lori Glaze at Ignition)
- 29Building the Moon Base (Ignition presentation)
Artemis II 24
- 1NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth
- 2Artemis II Press Kit
- 3Artemis II: NASA’s First Crewed Lunar Flyby in 50 Years (mission page)
- 4NASA’s Artemis II Crew Eclipses Record for Farthest Human Spaceflight
- 5Artemis II Launch Day Updates
- 6Artemis II Flight Update: Proximity Operations Complete, Perigee Raise Burn Up Next
- 7Artemis II Flight Update: Crew and Ground Teams Successfully Troubleshoot Orion’s Toilet
- 8Artemis II Flight Day 2: Orion Completes TLI Burn, Crew Begins Journey to the Moon
- 9Artemis II Flight Day 3: Crew Prepares for First Correction Burn, Readies to Receive Lunar Observation Assignment
- 10Artemis II Flight Day 4: Crew Completes Manual Piloting Demonstration
- 11Artemis II Flight Day 5: Crew Demos Suits, Readies for Lunar Flyby
- 12Artemis II Flight Day 6: Lunar Flyby Updates
- 13Artemis II Flight Day 6: Crew Wraps Historic Lunar Flyby
- 14Artemis II Flight Day 7: Crew Makes Long-Distance Call, Begins Return
- 15Artemis II Flight Day 8: Crew Conducts Key Tests on Return to Earth
- 16Artemis II Flight Day 9: Crew Prepares to Come Home
- 17Artemis II Flight Day 10: Live Re-Entry Updates
- 18NASA on Track for Future Missions with Initial Artemis II Assessments
- 19FAQ: NASA’s Artemis Campaign and Recent Updates
- 20NASA Identifies Cause of Artemis I Orion Heat Shield Char Loss
- 21NASA Shares Progress Toward Early Artemis Moon Missions with Crew
- 22NASA Shares Orion Heat Shield Findings, Updates Artemis Moon Missions
- 23NASA Adds Mission to Artemis Lunar Program, Updates Architecture
- 24NASA Joins Artemis III Orion Modules; Rocket Hardware Update
Orion 21
- 1Orion Reference Guide (encyclopedic edition)
- 2Orion Reference Guide (PDF)
- 3Crew Module
- 4European Service Module
- 5Launch Abort System
- 6Crew Systems
- 7Life Encapsulated: Inside NASA’s Orion for Artemis II Moon Mission
- 8NASA Announces Key Decision For Next Deep Space Transportation System
- 9NASA Outlines Challenges, Progress for Artemis Moon Missions
- 10NASA’s Management of the Artemis Missions, IG-22-003
- 11NASA: Assessments of Major Projects, GAO-26-108556
- 12Progress Continues for Future Orion Missions
- 13NASA Identifies Cause of Artemis I Orion Heat Shield Char Loss
- 14FAQ: NASA’s Artemis Campaign and Recent Updates
- 15NASA on Track for Future Missions with Initial Artemis II Assessments
- 16NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth
- 17Artemis II Launch Day Updates
- 18Artemis II Flight Update: Proximity Operations Complete, Perigee Raise Burn Up Next
- 19NASA’s Artemis III Moon Rocket Hardware Arrives, Artemis II Capsule Returns to Kennedy
- 20NASA Joins Artemis III Orion Modules; Rocket Hardware Update
- 21Artemis II Press Kit
Starship HLS 16
- 1NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 2NASA’s Management of the Artemis Missions (IG-22-003)
- 3As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon
- 4NextSTEP-2 H: Human Landing System (procurement record)
- 5NASA Awards SpaceX Second Contract Option for Artemis Moon Landing
- 6NASA’s Human Landing System Program: Progress Toward Artemis III and Beyond (IAC-24.B3.1.11)
- 7NASA Astronauts Test SpaceX Elevator Concept for Artemis Lunar Lander
- 8NASA, SpaceX Illustrate Key Moments of Artemis Lunar Lander Mission
- 9How NASA’s Artemis III Lander Test Will Pave Way for Moon Landings
- 10NASA: Assessments of Major Projects (GAO-26-108556)
- 11NASA Shares Progress Toward Early Artemis Moon Missions with Crew
- 12NASA Adds Mission to Artemis Lunar Program, Updates Architecture
- 13Returning to the Moon (Ignition presentation)
- 14NASA Artemis Mission Progresses with SpaceX Starship Test Flight
- 15SpaceX, Blue Origin share new lunar landing profiles
- 16SpaceX launches Starship into orbit for 1st time—largest rocket ever built notches key milestone on dramatic Flight 14 test
Blue Moon 16
- 1NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 2NASA Selects Blue Origin as Second Artemis Lunar Lander Provider
- 3NASA’s Human Landing System Program: Progress Toward Artemis III and Beyond (IAC-24.B3.1.11)
- 4Blue Origin targets 2025 for its first moon landing
- 5Blue Origin Moon Lander Completes Testing at NASA Vacuum Chamber
- 6NASA Provides Update on Moon Base Rovers, Landers, Missions
- 7Industry Moon Lander Training Cabin Lands at NASA for Artemis
- 8NASA: Assessments of Major Projects (GAO-26-108556)
- 9NASA Provides Updates on Moon Base Cargo Landers, Tech Demonstrations
- 10NASA Selects Blue Origin to Deliver VIPER Rover to Moon’s South Pole
- 11How NASA’s Artemis III Lander Test Will Pave Way for Moon Landings
- 12Returning to the Moon (Ignition presentation)
- 13Blue Origin launches third New Glenn rocket, but payload ends up in wrong orbit
- 14Blue Origin outlines return to flight logistics for its New Glenn rockets
- 15Blue Origin identifies engine issue behind New Glenn explosion
- 16NASA expects one lunar launch this year, Moon Base manager says
Refilling in orbit 16
- 1NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 2NASA’s Human Landing System Program: Progress Toward Artemis III and Beyond (IAC-24.B3.1.11)
- 3Cryogenic Fluid Management (CFM)
- 4NASA to Launch New Refueling Mission, Helping Spacecraft Live Longer and Journey Farther
- 5Stay Cool: NASA Tests Innovative Technique for Super Cold Fuel Storage
- 6Cryogenic Fluid Management fact sheet (FS-2023-078-133-MSFC)
- 7NASA Artemis Mission Progresses with SpaceX Starship Test Flight
- 8NASA Tech Contributes to Soft Moon Landing, Agency Science Underway
- 9NASA Tests New Device for Future In-Space Refueling Missions
- 102020 NASA Tipping Point Selections
- 11Robotic Refueling Mission 3
- 12NASA, Industry Prepare Cryogenic Fuel Technology Demo
- 13NASA: Assessments of Major Projects (GAO-26-108556)
- 14SpaceX, Blue Origin share new lunar landing profiles
- 15SpaceX launches Starship into orbit for 1st time—largest rocket ever built notches key milestone on dramatic Flight 14 test
- 16Returning to the Moon (Ignition presentation)
Gateway 22
- 1Gateway Space Station (reference)
- 2A Lunar Orbit That’s Just Right for the International Gateway
- 3NASA Awards Artemis Contract for Lunar Gateway Power, Propulsion
- 4NASA’s Management of the Gateway Program for Artemis Missions, IG-21-004
- 5NASA Awards Contract to Launch Initial Elements for Lunar Outpost
- 6NASA, Northrop Grumman Finalize Moon Outpost Living Quarters Contract
- 7Reconfiguration of NASA GRC’s Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware
- 8NASA, United Arab Emirates Announce Artemis Lunar Gateway Airlock
- 9NASA Shares Progress Toward Early Artemis Moon Missions with Crew
- 10NASA: Assessments of Major Projects, GAO-26-108556
- 11NASA Unveils Initiatives to Achieve America’s National Space Policy
- 12NASA outlines ambitious $20 billion plan for moon base
- 13Trump Megabill Includes Billions for Artemis, ISS, Moving a Space Shuttle to Texas and More
- 14Trump FY2027 NASA Budget Supports Moon Missions, But Cuts Everything Else
- 15America Underway in Space on Nuclear Power (Ignition fact sheet)
- 16Space Reactor-1 Freedom (mission page)
- 17NASA Provides Updates on Moon Base Cargo Landers, Tech Demonstrations
- 18NASA, Northrop Grumman repurpose Gateway elements for Moon Base demo missions
- 19ESA Details Next Steps for Agency’s Gateway Contributions
- 20MDA Space Will ‘Repurpose’ Canadarm3 For Lunar Surface
- 21UAE MBRSC reaffirms role after NASA halts Lunar Gateway
- 22NASA, Canadian Space Agency Formalize Gateway Partnership for Artemis Program
CLPS 19
- 1Commercial Lunar Payload Services (reference)
- 2Commercial Lunar Payload Services (program page)
- 3Examining the Commercial Lander Services Powering NASA’s Return to the Moon
- 4NASA Science, Astrobotic Peregrine Mission One Concludes
- 5NASA Tech Contributes to Soft Moon Landing, Agency Science Underway
- 6NASA, Intuitive Machines Share Images from the Moon, Provide Science Updates
- 7NASA’s LRO Images Intuitive Machine’s Odysseus Lander
- 8Touchdown! Carrying NASA Science, Firefly’s Blue Ghost Lands on Moon
- 9NASA Science Continues After Firefly’s First Moon Mission Concludes
- 10NASA Receives Some Data Before Intuitive Machines Ends Lunar Mission
- 11Ignition
- 12Building the Moon Base (Ignition presentation)
- 13NASA Provides Update on Moon Base Rovers, Landers, Missions
- 14NASA Provides Updates on Moon Base Cargo Landers, Tech Demonstrations
- 15NASA expects one lunar launch this year, Moon Base manager says
- 16Commercial Lunar Payload Services (CLPS) Deliveries
- 17CLPS News
- 18NASA Awards More Moon Base Science, Previews New Opportunities
- 19Commercial Lunar Payload Services 2.0 (CLPS2): acquisition page and milestone schedule
Chapter 6Reading the universe
Hubble, Webb and Roman 28
- 1About Hubble
- 2The History of Hubble
- 3Hubble’s Mirror Flaw
- 4Astronaut Missions to Hubble
- 5Operating Hubble with Only One Gyroscope
- 6NASA to Change How It Points Hubble Space Telescope
- 7Hubble FAQs
- 8NASA’s Hubble Seeks Lensed Supernova, Marks 200,000 Orbits
- 9On the Shoulders of a Giant (Hubble vs. Webb)
- 10About Webb
- 11Webb’s Orbit
- 12James Webb Space Telescope: Project Meeting Commitments but Current Technical, Cost, and Schedule Challenges Could Affect Continued Progress (GAO-14-72)
- 13James Webb Space Telescope: Integration and Test Challenges Have Delayed Launch and Threaten to Push Costs Over Cap (GAO-18-273)
- 14NASA Completes Webb Telescope Review, Commits to Launch in Early 2021
- 15James Webb Space Telescope: Project Nearing Completion, but Work to Resolve Challenges Continues (GAO-21-406)
- 16Expanding Our View (Hubble vs. Roman)
- 17NASA’s Dark Universe-Seeking Nancy Grace Roman Space Telescope Launches
- 18Fuel Savings Double Potential Lifetime for NASA’s Roman Mission
- 19NASA Activates Roman’s Primary Instrument, Checks Out Coronagraph
- 20NASA Checks Roman Guidance System, Takes First Coronagraph Observation
- 21NASA’s Fiscal Year 2027 Budget Request (summary)
- 22NASA Appropriations and Authorizations: At a Glance (R43419)
- 23Bill Summary: Commerce, Justice, Science, and Related Agencies Fiscal Year 2026 Appropriations Bill
- 24You just saved NASA’s budget
- 25House Clears FY2027 CR, Now to the President
- 26NASA Says Webb’s Excess Fuel Likely to Extend its Lifetime Expectations
- 27NASA’s Webb Reveals Dynamic Panorama of Star Formation
- 28NASA’s Webb Takes Star-Filled Portrait of Pillars of Creation
Mars 24
- 1Mars Science Laboratory: Curiosity Rover
- 2NASA’s Management of the Mars Science Laboratory Project (IG-11-019)
- 3Curiosity Reaches 1-Kilometer Elevation Gain
- 4Curiosity Postcard Celebrates Rover’s 5,000th Day on Mars (PIA26700)
- 5NASA Study: Non-biologic Processes Don’t Fully Explain Mars Organics
- 6Mars 2020: Perseverance Rover
- 7Mars 2020 Perseverance Launch Press Kit: Quick Facts
- 8The 33 Sample Tubes Collected by Perseverance (PIA26643)
- 9Installing Perseverance’s Sample Tubes (PIA24305)
- 10NASA Says Mars Rover Discovered Potential Biosignature Last Year
- 11After Three Years on Mars, NASA’s Ingenuity Helicopter Mission Ends
- 12NASA Will Inspire World When It Returns Mars Samples to Earth in 2033
- 13NASA Sets Path to Return Mars Samples, Seeks Innovative Designs
- 14NASA to Explore Two Landing Options for Returning Samples from Mars
- 15Mars Sample Return
- 16You just saved NASA’s budget
- 17Bill Summary: Commerce, Justice, Science, and Related Agencies Fiscal Year 2026 Appropriations Bill
- 18NASA’s Fiscal Year 2027 Budget Request (summary)
- 19NASA Appropriations and Authorizations: At a Glance (R43419)
- 20The FY 2027 NASA budget request
- 21NASA Selects Blue Origin as Mars Telecommunications Network Provider
- 22ESCAPADE
- 23Space Reactor-1 Freedom
- 24House Clears FY2027 CR, Now to the President
The outer planets 27
- 1Voyager Fact Sheet
- 2Voyager
- 3The Interstellar Mission
- 4NASA Shuts Off Instrument on Voyager 1 to Keep Spacecraft Operating
- 5NASA Engineers Help Prolong Voyager 2’s Science Mission
- 6What Is a Light-Day?
- 7Pale Blue Dot Revisited (PIA23645)
- 8New Horizons
- 9NASA’s New Horizons Spacecraft Wakes from Hibernation in Good Health
- 10NASA’s New Horizons Finds Evidence of Recent Liquid on Pluto’s Surface
- 11Juno
- 12NASA’s Juno Mission Captures Jupiter Moon Thebe (PIA26751)
- 13NASA’s Juno Mission Redefines Size, Shape of Jupiter
- 14Europa Clipper
- 15Europa Clipper Launch Press Kit: Quick Facts
- 16Europa Clipper Launch Press Kit: Mission Overview
- 17Letter to the Senate Committee on Appropriations on the Europa Clipper launch vehicle mandate
- 18NASA Awards Launch Services Contract for Europa Clipper Mission
- 19Dragonfly
- 20NASA’s Dragonfly Will Fly Around Titan Looking for Origins, Signs of Life
- 21NASA’s Dragonfly Rotorcraft Mission to Saturn’s Moon Titan Confirmed
- 22NASA’s Dragonfly Clears Key Tests as Titan Rotorcraft Takes Shape
- 23NASA’s Dragonfly Gets Wired Up While Titan Landing Area Is Named
- 24You just saved NASA’s budget
- 25NASA’s Fiscal Year 2027 Budget Request (summary)
- 26The FY 2027 NASA budget request
- 27House Clears FY2027 CR, Now to the President
The Sun 21
- 1Parker Solar Probe
- 2Amazing Achievements From Parker Solar Probe
- 3Parker Solar Probe and the Birth of the Solar Wind
- 4NASA’s Parker Solar Probe Makes History With Closest Pass to Sun
- 5Parker Solar Probe Instruments
- 6NASA’s Parker Solar Probe Snaps Closest-Ever Images to Sun
- 7Parker Solar Probe Makes 28th Close Pass of Sun
- 8After Latest Swing Past Sun, NASA’s Parker Solar Probe Checks In
- 9NASA, NOAA: Sun Reaches Maximum Phase in 11-Year Solar Cycle
- 10How NASA Tracked the Most Intense Solar Storm in Decades
- 11Geomagnetic Storms
- 12Electric Power Transmission
- 13Satellite Drag
- 14Space Weather Observations at L1 to Advance Readiness (SOLAR)-1
- 15NASA’s IMAP Mission Reaches Its Destination
- 16NASA’s IMAP Begins Primary Science Mission
- 17You just saved NASA’s budget
- 18NASA’s Fiscal Year 2027 Budget Request (summary)
- 19NASA Appropriations and Authorizations: At a Glance (R43419)
- 20The FY 2027 NASA budget request
- 21House Clears FY2027 CR, Now to the President
Chapter 7Who builds it, who pays
The builders 18
- 1Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 2National Aeronautics and Space Act of 1958 (Unamended)
- 3Apollo: A Retrospective Analysis (Monographs in Aerospace History 3)
- 4Spending by recipient, NASA contracts, fiscal years 2021–2025
- 5Artemis Partners
- 6On the Shoulders of Titans: A History of Project Gemini (NASA SP-4203)
- 7The Space Shuttle Decision (NASA SP-4221)
- 8NASA’s Management of the Space Launch System Stages Contract (IG-19-001)
- 9NASA’s Management of the Artemis Missions (IG-22-003)
- 10NASA: Assessments of Major Projects (GAO-26-108556)
- 11Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA SP-2014-617)
- 12NASA’s Commercial Crew Program Faces Schedule Delays, Cost Increases, and Safety Challenges
- 13NASA Awards SpaceX Three Crew Flights to Space Station
- 14NASA’s Management of the Human Landing System Contracts (IG-26-004)
- 15NASA Strengthens Artemis: Adds Mission, Refines Overall Architecture
- 16Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. VI
- 17Audit of NASA’s Deep Space Network (IG-23-016)
- 18Blue Origin Moon Lander Completes Testing at NASA Vacuum Chamber
NASA’s budget 12
- 1NASA Appropriations and Authorizations: At a Glance (R43419)
- 2NASA’s Fiscal Year 2027 Budget Request
- 3FY 2027 Budget Request Agency Fact Sheet
- 4Historical Tables, Table 4.1: Outlays by Agency, 1962–2031
- 5Historical Tables, Table 10.1: Gross Domestic Product and Deflators Used in the Historical Tables
- 6A Glossary of Terms Used in the Federal Budget Process (GAO-05-734SP)
- 7NASA: Assessments of Major Projects (GAO-26-108556)
- 8Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 9House Clears FY2027 CR, Now to the President
- 10House Appropriators Reject Deep Cuts to NASA in FY2027
- 11The FY 2027 NASA budget request
- 12Republican-backed reconciliation bill passes, includes funding for ISS, Artemis programs, Space Shuttle relocation
Mission operations 11
- 1History of the Networks
- 2This New Ocean: A History of Project Mercury (NASA SP-4201)
- 3On the Shoulders of Titans: A History of Project Gemini (NASA SP-4203)
- 4Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)
- 5Basics of Space Flight, Chapter 18: Deep Space Network
- 6Deep Space Network
- 7Audit of NASA’s Deep Space Network (IG-23-016)
- 8New Next-Gen Dish Adds Muscle to NASA’s Deep Space Network
- 9Networks Keeping NASA’s Artemis II Mission Connected
- 10NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth
- 11Gemini Pioneered the Technology Driving Today’s Exploration
NASA 228
- 20 Years Ago: Remembering Columbia and Her CrewUsed in The Space Shuttle
- 2020 NASA Tipping Point SelectionsUsed in Refilling in orbit
- 55 Years Ago: Gemini VIII, the First Docking in SpaceUsed in Mercury & Gemini
- 55 Years Ago: Gemini X Soars to New HeightsUsed in Mercury & Gemini
- 55 Years Ago: Gemini XII Closes Out a Successful Program, Paves the Way for ApolloUsed in Mercury & Gemini
- 55 Years Ago: The Apollo 1 Fire and its AftermathUsed in Apollo
- 65 Years Ago: The National Aeronautics and Space Act of 1958 Creates NASAUsed in The birth of NASA
- A Lunar Orbit That’s Just Right for the International GatewayUsed in Gateway
- About HubbleUsed in Hubble, Webb and Roman
- About WebbUsed in Hubble, Webb and Roman
- Administrator Isaacman Visits Blue Origin (image releases)Used in New Glenn & Vulcan
- After Latest Swing Past Sun, NASA’s Parker Solar Probe Checks InUsed in The Sun
- After Three Years on Mars, NASA’s Ingenuity Helicopter Mission EndsUsed in Mars
- Amazing Achievements From Parker Solar ProbeUsed in The Sun
- America Underway in Space on Nuclear Power (Ignition fact sheet)Used in Gateway
- Artemis II Flight Day 10: Live Re-Entry UpdatesUsed in Artemis II
- Artemis II Flight Day 2: Orion Completes TLI Burn, Crew Begins Journey to the MoonUsed in Artemis II
- Artemis II Flight Day 3: Crew Prepares for First Correction Burn, Readies to Receive Lunar Observation AssignmentUsed in Artemis II
- Artemis II Flight Day 4: Crew Completes Manual Piloting DemonstrationUsed in Artemis II
- Artemis II Flight Day 5: Crew Demos Suits, Readies for Lunar FlybyUsed in Artemis II
- Artemis II Flight Day 6: Crew Wraps Historic Lunar FlybyUsed in Artemis II
- Artemis II Flight Day 6: Lunar Flyby UpdatesUsed in Artemis II
- Artemis II Flight Day 7: Crew Makes Long-Distance Call, Begins ReturnUsed in Artemis II
- Artemis II Flight Day 8: Crew Conducts Key Tests on Return to EarthUsed in Artemis II
- Artemis II Flight Day 9: Crew Prepares to Come HomeUsed in Artemis II
- Artemis II Flight Update: Crew and Ground Teams Successfully Troubleshoot Orion’s ToiletUsed in Artemis II
- Artemis II Flight Update: Proximity Operations Complete, Perigee Raise Burn Up NextUsed in Artemis II, Orion
- Artemis II Launch Day UpdatesUsed in Artemis II, Orion
- Artemis II Press KitUsed in Artemis II, The Artemis plan, Orion
- Artemis II rollout and Vehicle Assembly Building (image releases)Used in Spaceports
- Artemis II: NASA’s First Crewed Lunar Flyby in 50 Years (mission page)Used in Artemis II
- Artemis III Core Stage Arrival at VAB (image release)Used in Space Launch System
- Artemis III Crew Visits Launch Complex 39A (image release)Used in Spaceports
- Artemis IVUsed in The Artemis plan
- Artemis PartnersUsed in The builders
- As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on MoonUsed in How rockets reach orbit, Starship, The Artemis plan, Starship HLS
- Astronaut Missions to HubbleUsed in Hubble, Webb and Roman
- Blue Origin Moon Lander Completes Testing at NASA Vacuum ChamberUsed in The builders, Blue Moon
- Boldly Go! NASA’s New Space Toilet Offers More Comfort, Improved Efficiency for Deep Space MissionsUsed in Life in orbit
- Building the Moon Base (Ignition presentation)Used in The Artemis plan, CLPS
- Chariots for Apollo: A History of Manned Lunar Spacecraft (NASA SP-4205)Used in Apollo
- CLPS NewsUsed in CLPS
- CLPS Peregrine Mission One (PM-1) Astrobotic/ULA Liftoff (image release)Used in New Glenn & Vulcan
- Commercial Lunar Payload Services (program page)Used in CLPS
- Commercial Lunar Payload Services (reference)Used in CLPS
- Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA SP-2014-617)Used in The builders, Commercial crew
- Commercial Orbital Transportation Services: A New Era in Spaceflight (NASA/SP-2014-617)Used in Falcon 9, Spaceports
- Crew ModuleUsed in Orion
- Crew SystemsUsed in Orion
- Curiosity Postcard Celebrates Rover’s 5,000th Day on Mars (PIA26700)Used in Mars
- Curiosity Reaches 1-Kilometer Elevation GainUsed in Mars
- Deep Space NetworkUsed in Mission operations
- DragonflyUsed in The outer planets
- ESCAPADEUsed in Mars
- Europa ClipperUsed in The outer planets
- European Service ModuleUsed in Orion
- Expanding Our View (Hubble vs. Roman)Used in Hubble, Webb and Roman
- Fact Sheet: NASA Unveils Transformative Initiatives to Achieve America’s National Space Policy (Ignition)Used in Commercial stations, Life in orbit
- Falcon 9 Landing Following NASA’s SpaceX Crew-13 Launch (image release)Used in Falcon 9, Spaceports
- FAQ: NASA’s Artemis Campaign and Recent UpdatesUsed in Artemis II, Orion
- Fuel Savings Double Potential Lifetime for NASA’s Roman MissionUsed in Hubble, Webb and Roman
- FY 2027 Budget Request Agency Fact SheetUsed in NASA’s budget
- Gateway Space Station (reference)Used in Gateway
- Gemini IX and the Angry AlligatorUsed in Mercury & Gemini
- Gemini XIUsed in Mercury & Gemini
- How Early Astronaut Photographs Inspired the Landsat ProgramUsed in Landsat
- How NASA Tracked the Most Intense Solar Storm in DecadesUsed in The Sun
- How NASA’s Artemis III Lander Test Will Pave Way for Moon LandingsUsed in New Glenn & Vulcan, Starship, The Artemis plan, Blue Moon, Starship HLS
- Hubble FAQsUsed in Hubble, Webb and Roman
- Hubble’s Mirror FlawUsed in Hubble, Webb and Roman
- IgnitionUsed in The Artemis plan, CLPS
- In the Beginning: Project MercuryUsed in Mercury & Gemini
- Industry Moon Lander Training Cabin Lands at NASA for ArtemisUsed in Blue Moon
- International Space Station (encyclopedia entry)Used in ISS
- International Space Station Deorbit Analysis SummaryUsed in ISS
- JunoUsed in The outer planets
- LandsatUsed in Landsat
- Landsat 1Used in Landsat
- Landsat 5Used in Landsat
- Landsat 9Used in Landsat
- Launch Abort SystemUsed in Orion
- Launch Complex 39B (fact sheet FS-2021-08-726-KSC)Used in Spaceports
- Life Encapsulated: Inside NASA’s Orion for Artemis II Moon MissionUsed in Orion
- Living and Working in Space (fact sheet)Used in Life in orbit
- Main Engine Cuts Off, Falcon 9 First Stage Separates (SpaceX CRS-24 launch blog)Used in Falcon 9, How rockets reach orbit
- Mars 2020: Perseverance RoverUsed in Mars
- Mars Sample ReturnUsed in Mars
- Mars Science Laboratory: Curiosity RoverUsed in Mars
- Mental Well-Being in SpaceUsed in Life in orbit
- Mercury Crewed Flights SummaryUsed in Mercury & Gemini
- Mission Success! Celebrating Landsat 9’s Five-Year Design Life MilestoneUsed in Landsat
- NASA Achieves Water Recovery Milestone on International Space StationUsed in Life in orbit
- NASA Activates Roman’s Primary Instrument, Checks Out CoronagraphUsed in Hubble, Webb and Roman
- NASA Adds Blue Origin New Glenn 9×4 to Launch Services ContractUsed in New Glenn & Vulcan
- NASA Adds Mission to Artemis Lunar Program, Updates ArchitectureUsed in Space Launch System, Starship, Artemis II, The Artemis plan, Starship HLS
- NASA Administrator Statement on Return to Moon in Next Five YearsUsed in The Artemis plan
- NASA Announces Key Decision For Next Deep Space Transportation SystemUsed in Orion
- NASA Artemis Mission Progresses with SpaceX Starship Test FlightUsed in Refilling in orbit, Starship HLS
- NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew DragonUsed in Falcon 9, Spaceports, Commercial crew
- NASA Astronauts Test SpaceX Elevator Concept for Artemis Lunar LanderUsed in Starship HLS
- NASA Awards Artemis Contract for Lunar Gateway Power, PropulsionUsed in Gateway
- NASA Awards Contract to Launch Initial Elements for Lunar OutpostUsed in Gateway
- NASA Awards Launch Services Contract for Europa Clipper MissionUsed in The outer planets
- NASA Awards Launch Services Contract for NOAA’s JPSS-4 MissionUsed in Weather satellites
- NASA Awards More Moon Base Science, Previews New OpportunitiesUsed in CLPS
- NASA Awards SpaceX Second Contract Option for Artemis Moon LandingUsed in Starship HLS
- NASA Awards SpaceX Three Crew Flights to Space StationUsed in The builders, Falcon 9, Commercial crew
- NASA Certifies First Commercial Human Spaceflight SystemUsed in Falcon 9
- NASA Charts More Reliable Course for America’s Return to Lunar Surface (Going Back to the Moon fact sheet)Used in The Artemis plan
- NASA Checks Roman Guidance System, Takes First Coronagraph ObservationUsed in Hubble, Webb and Roman
- NASA Chooses American Companies to Transport U.S. Astronauts to International Space StationUsed in Commercial crew
- NASA Completes Webb Telescope Review, Commits to Launch in Early 2021Used in Hubble, Webb and Roman
- NASA Engineers Help Prolong Voyager 2’s Science MissionUsed in The outer planets
- NASA Identifies Cause of Artemis I Orion Heat Shield Char LossUsed in Artemis II, Orion
- NASA Independent Review Team: SpaceX CRS-7 Accident Investigation Report (Public Summary)Used in Falcon 9
- NASA Joins Artemis III Orion Modules; Rocket Hardware UpdateUsed in Artemis II, The Artemis plan, Orion
- NASA Marches Toward Artemis III Mission in 2027, Names Crew MembersUsed in The Artemis plan
- NASA Marshall Thermal Engineering Lab Provides Key Insight to Human Landing System (image release)Used in Starship
- NASA on Track for Future Missions with Initial Artemis II AssessmentsUsed in Artemis II, Orion
- NASA Outlines Challenges, Progress for Artemis Moon MissionsUsed in The Artemis plan, Orion
- NASA Provides Update on Moon Base Rovers, Landers, MissionsUsed in Blue Moon, CLPS
- NASA Provides Update on Space Station LeakUsed in Commercial stations, ISS
- NASA Provides Updates on Moon Base Cargo Landers, Tech DemonstrationsUsed in The Artemis plan, Blue Moon, CLPS, Gateway
- NASA Receives Some Data Before Intuitive Machines Ends Lunar MissionUsed in CLPS
- NASA Releases Landsat 10 Spacecraft Request for ProposalUsed in Landsat
- NASA Releases Report on Starliner Crewed Flight Test InvestigationUsed in Commercial crew
- NASA Says Webb’s Excess Fuel Likely to Extend its Lifetime ExpectationsUsed in Hubble, Webb and Roman
- NASA Science Continues After Firefly’s First Moon Mission ConcludesUsed in CLPS
- NASA Science, Astrobotic Peregrine Mission One ConcludesUsed in CLPS
- NASA Seeks Industry Input on Second Phase of Commercial Space StationsUsed in Commercial stations
- NASA Selects Blue Origin as Mars Telecommunications Network ProviderUsed in Mars
- NASA Selects Blue Origin as Second Artemis Lunar Lander ProviderUsed in New Glenn & Vulcan, The Artemis plan, Blue Moon
- NASA Selects Blue Origin to Deliver VIPER Rover to Moon’s South PoleUsed in Blue Moon
- NASA Selects Companies to Develop Commercial Destinations in SpaceUsed in Commercial stations
- NASA Selects First Commercial Destination Module for International Space StationUsed in Commercial stations
- NASA Selects International Space Station US Deorbit VehicleUsed in ISS
- NASA Selects Launch Provider for New NOAA Environmental SatelliteUsed in Weather satellites
- NASA Sets Path to Return Mars Samples, Seeks Innovative DesignsUsed in Mars
- NASA Shares Orion Heat Shield Findings, Updates Artemis Moon MissionsUsed in Artemis II, The Artemis plan
- NASA Shares Progress Toward Early Artemis Moon Missions with CrewUsed in Artemis II, The Artemis plan, Gateway, Starship HLS
- NASA Shuts Off Instrument on Voyager 1 to Keep Spacecraft OperatingUsed in The outer planets
- NASA Signs Agreement with SpaceX for Use of Historic Launch PadUsed in Spaceports
- NASA Starts Artemis III Engine Install; Boosters, Crew Training AdvanceUsed in The Artemis plan
- NASA Strengthens Artemis: Adds Mission, Refines Overall ArchitectureUsed in The builders, The Artemis plan
- NASA Study: Non-biologic Processes Don’t Fully Explain Mars OrganicsUsed in Mars
- NASA Tech Contributes to Soft Moon Landing, Agency Science UnderwayUsed in CLPS, Refilling in orbit
- NASA to Change How It Points Hubble Space TelescopeUsed in Hubble, Webb and Roman
- NASA to Explore Two Landing Options for Returning Samples from MarsUsed in Mars
- NASA Unveils Initiatives to Achieve America’s National Space PolicyUsed in The Artemis plan, Gateway
- NASA Welcomes Record-Setting Artemis II Moonfarers Back to EarthUsed in Mission operations, Space Launch System, Artemis II, The Artemis plan, Orion
- NASA Will Inspire World When It Returns Mars Samples to Earth in 2033Used in Mars
- NASA, Blue Origin Launch Two Spacecraft to Study Mars, Solar WindUsed in New Glenn & Vulcan
- NASA, Boeing Modify Commercial Crew ContractUsed in Commercial crew
- NASA, Boeing Share Update on Commercial Starliner Development PlansUsed in Commercial crew
- NASA, Canadian Space Agency Formalize Gateway Partnership for Artemis ProgramUsed in Gateway
- NASA, Intuitive Machines Share Images from the Moon, Provide Science UpdatesUsed in CLPS
- NASA, NOAA: Sun Reaches Maximum Phase in 11-Year Solar CycleUsed in The Sun
- NASA, Northrop Grumman Finalize Moon Outpost Living Quarters ContractUsed in Gateway
- NASA, SpaceX Advance Wind Tunnel Tests at NASA Ames (image release)Used in Starship
- NASA, SpaceX Illustrate Key Moments of Artemis Lunar Lander MissionUsed in Starship HLS
- NASA, SpaceX Launch NOAA’s Latest Weather SatelliteUsed in Weather satellites
- NASA, United Arab Emirates Announce Artemis Lunar Gateway AirlockUsed in Gateway
- NASA’s Artemis II Crew Eclipses Record for Farthest Human SpaceflightUsed in Artemis II, Apollo
- NASA’s Artemis III Moon Rocket Hardware Arrives, Artemis II Capsule Returns to KennedyUsed in Orion
- NASA’s Dark Universe-Seeking Nancy Grace Roman Space Telescope LaunchesUsed in Hubble, Webb and Roman
- NASA’s Dragonfly Clears Key Tests as Titan Rotorcraft Takes ShapeUsed in The outer planets
- NASA’s Dragonfly Gets Wired Up While Titan Landing Area Is NamedUsed in The outer planets
- NASA’s Dragonfly Rotorcraft Mission to Saturn’s Moon Titan ConfirmedUsed in The outer planets
- NASA’s Dragonfly Will Fly Around Titan Looking for Origins, Signs of LifeUsed in The outer planets
- NASA’s Fiscal Year 2027 Budget RequestUsed in NASA’s budget, Hubble, Webb and Roman, Mars, The outer planets, The Sun
- NASA’s Hubble Seeks Lensed Supernova, Marks 200,000 OrbitsUsed in Hubble, Webb and Roman
- NASA’s IMAP Begins Primary Science MissionUsed in The Sun
- NASA’s IMAP Mission Reaches Its DestinationUsed in The Sun
- NASA’s Juno Mission Captures Jupiter Moon Thebe (PIA26751)Used in The outer planets
- NASA’s Juno Mission Redefines Size, Shape of JupiterUsed in The outer planets
- NASA’s Lunar Exploration Program Overview (the Artemis Plan)Used in The Artemis plan
- NASA’s New Horizons Finds Evidence of Recent Liquid on Pluto’s SurfaceUsed in The outer planets
- NASA’s New Horizons Spacecraft Wakes from Hibernation in Good HealthUsed in The outer planets
- NASA’s Parker Solar Probe Makes History With Closest Pass to SunUsed in The Sun
- NASA’s Parker Solar Probe Snaps Closest-Ever Images to SunUsed in The Sun
- NASA’s SpaceX Crew-13 Launches to International Space Station (release 26-081)Used in Orbits, Falcon 9, Commercial crew, ISS, Life in orbit
- NASA’s Webb Reveals Dynamic Panorama of Star FormationUsed in Hubble, Webb and Roman
- NASA’s Webb Takes Star-Filled Portrait of Pillars of CreationUsed in Hubble, Webb and Roman
- Networks Keeping NASA’s Artemis II Mission ConnectedUsed in Mission operations
- New HorizonsUsed in The outer planets
- NextSTEP-2 H: Human Landing System (procurement record)Used in Starship HLS
- On the Shoulders of a Giant (Hubble vs. Webb)Used in Hubble, Webb and Roman
- On the Shoulders of Titans: A History of Project Gemini (NASA SP-4203)Used in The builders, Mission operations, Mercury & Gemini
- Operating Hubble with Only One GyroscopeUsed in Hubble, Webb and Roman
- Orders of Magnitude: A History of the NACA and NASA, 1915–1990 (NASA SP-4406)Used in The builders, Mission operations, NASA’s budget, Apollo, The birth of NASA, The Space Shuttle
- Orion Reference Guide (encyclopedic edition)Used in Orion
- Orion Reference Guide (PDF)Used in Orion
- Parker Solar ProbeUsed in The Sun
- Parker Solar Probe and the Birth of the Solar WindUsed in The Sun
- Parker Solar Probe InstrumentsUsed in The Sun
- Parker Solar Probe Makes 28th Close Pass of SunUsed in The Sun
- Progress Continues for Future Orion MissionsUsed in Orion
- Project Gemini: Apollo’s Training GroundUsed in Mercury & Gemini
- Project MercuryUsed in Mercury & Gemini
- Project Mercury Overview: SummaryUsed in Mercury & Gemini
- Released: NASA Goddard Issues Draft Request for Proposal for the Landsat 10 SpacecraftUsed in Landsat
- Returning to the Moon (presentation by Lori Glaze at Ignition)Used in The Artemis plan, Blue Moon, Refilling in orbit, Starship HLS
- Rockets: Educator’s Guide with Activities in Science, Technology, Engineering, and Mathematics (MSFC-12-2025-SLS-5576)Used in How rockets reach orbit
- SOHO (Solar and Heliospheric Observatory)Used in Orbits
- Space Launch System (reference guide)Used in How rockets reach orbit, Space Launch System
- Space Reactor-1 Freedom (mission page)Used in Gateway, Mars
- Space ShuttleUsed in The Space Shuttle
- Space Shuttle Missions (mission index)Used in The Space Shuttle
- Starship Flight 6 seen from the International Space Station (iss072e220043)Used in Starship
- Station FactsUsed in Orbits, ISS
- STS-135: The Final VoyageUsed in The Space Shuttle
- The Apollo ProgramUsed in Apollo
- The CrawlersUsed in Spaceports
- The History of HubbleUsed in Hubble, Webb and Roman
- The International Space Station Marks 25 Years of Continuous Human PresenceUsed in Commercial crew, ISS, Life in orbit
- The Interstellar MissionUsed in The outer planets
- The Space Shuttle (reference)Used in The Space Shuttle
- The Space Shuttle Decision (NASA SP-4221)Used in The builders, The Space Shuttle
- This New Ocean: A History of Project Mercury (NASA SP-4201)Used in Mission operations, Mercury & Gemini
- This Week in NASA History: ABMA Transferred to NASA, Creating Marshall Center—July 1, 1960Used in The birth of NASA
- Top Things to Know about Space Station Crew HandoversUsed in Life in orbit
- Touchdown! Carrying NASA Science, Firefly’s Blue Ghost Lands on MoonUsed in CLPS
- Tracking and Data Relay SatellitesUsed in Orbits
- VoyagerUsed in The outer planets
- Voyager Fact SheetUsed in The outer planets
- Webb’s OrbitUsed in Orbits, Hubble, Webb and Roman
- What is a Lagrange Point?Used in Orbits
- What Is a Light-Day?Used in The outer planets
NASA Office of Inspector General 21
- Audit of Commercial Resupply Services to the International Space Station (IG-18-016)Used in Falcon 9
- Audit of NASA’s Deep Space Network (IG-23-016)Used in The builders, Mission operations
- Examining the Commercial Lander Services Powering NASA’s Return to the MoonUsed in CLPS
- Letter to the Senate Committee on Appropriations on the Europa Clipper launch vehicle mandateUsed in The outer planets
- NASA’s Acquisition of Next-Generation Spacesuit Services (IG-26-006)Used in Life in orbit
- NASA’s Commercial Crew Program Faces Schedule Delays, Cost Increases, and Safety ChallengesUsed in The builders, Falcon 9
- NASA’s Commercial Crew Program: Update on Development and Certification Efforts (IG-16-028)Used in Commercial crew
- NASA’s Management of Crew Transportation to the International Space Station (IG-20-005)Used in Commercial crew
- NASA’s Management of Its Commercial Crew Program (IG-26-011)Used in Commercial crew, ISS
- NASA’s Management of Risks to Sustaining ISS Operations through 2030 (IG-24-020)Used in Commercial stations, ISS
- NASA’s Management of Space Launch System Block 1B Development (IG-24-015)Used in Space Launch System
- NASA’s Management of Space Launch System Program Costs and Contracts (IG-20-012)Used in Space Launch System
- NASA’s Management of the Artemis Missions (IG-22-003)Used in The builders, The Artemis plan, Orion, Starship HLS
- NASA’s Management of the Artemis Missions (IG-22-003)Used in Space Launch System
- NASA’s Management of the Gateway Program for Artemis Missions, IG-21-004Used in Gateway
- NASA’s Management of the Human Landing System Contracts (IG-26-004)Used in The builders, New Glenn & Vulcan, How rockets reach orbit, Spaceports, Starship, Blue Moon, Refilling in orbit, Starship HLS
- NASA’s Management of the Human Landing System Contracts, IG-26-004Used in The Artemis plan
- NASA’s Management of the Mars Science Laboratory Project (IG-11-019)Used in Mars
- NASA’s Management of the Space Launch System Booster and Engine Contracts (IG-23-015)Used in Space Launch System
- NASA’s Management of the Space Launch System Stages Contract (IG-19-001)Used in The builders
- Spacesuit Development Delays Could Impact Artemis Timeline and ISS OperationsUsed in The Artemis plan
Spaceflight Now 14
- Blue Origin identifies engine issue behind New Glenn explosionUsed in New Glenn & Vulcan, Blue Moon
- Blue Origin launches third New Glenn rocket, but payload ends up in wrong orbitUsed in New Glenn & Vulcan, How rockets reach orbit, Blue Moon
- Blue Origin outlines return to flight logistics for its New Glenn rocketsUsed in Blue Moon
- Blue Origin’s New Glenn rocket explodes during prelaunch testing at Cape CanaveralUsed in New Glenn & Vulcan
- NASA outlines ambitious $20 billion plan for moon baseUsed in The Artemis plan, Gateway
- NASA plans unpiloted Starliner test flight at end of yearUsed in Commercial crew
- NASA, Northrop Grumman repurpose Gateway elements for Moon Base demo missionsUsed in Gateway
- Republican-backed reconciliation bill passes, includes funding for ISS, Artemis programs, Space Shuttle relocationUsed in NASA’s budget
- SpaceX launches Starlink mission on a Falcon booster’s record-breaking 37th flightUsed in Falcon 9
- Starship returns to Earth; rocket splashes down north of Hawaii after three-hour flightUsed in Starship
- Super Heavy-Starship rocket chalks up mostly successful test flightUsed in Starship
- U.S. Space Force awards $13.7 billion in new national security launch contracts to Blue Origin, SpaceX and ULAUsed in New Glenn & Vulcan
- ULA confirms successful solid rocket booster test as Vulcan anomaly investigation continuesUsed in New Glenn & Vulcan
- Vulcan suffers solid rocket booster problem during USSF-87 launchUsed in New Glenn & Vulcan
NOAA NESDIS 13
- Advanced Baseline Imager (ABI)Used in Weather satellites
- Celebrating 50 Years of GOESUsed in Weather satellites
- DSCOVR: Deep Space Climate ObservatoryUsed in Orbits
- Geostationary Lightning Mapper (GLM)Used in Weather satellites
- Geostationary Satellites (NOAA’s GOES-R Series)Used in Orbits, Weather satellites
- How NOAA Satellites Help Us Stay Ahead of Severe Weather SeasonUsed in Weather satellites
- Hurricane Beryl Brings Massive Power Outages to East TexasUsed in Weather satellites
- Hurricane Milton Eyes FloridaUsed in Weather satellites
- Joint Polar Satellite SystemUsed in Weather satellites
- Near Earth Orbit Network (NEON)Used in Weather satellites
- NOAA Announces New Awards totaling $67M to Purchase Operational Commercial Data to Enhance Weather Forecasts and Space Weather MonitoringUsed in Weather satellites
- NOAA’s GOES-19 Now Operational as GOES East, Providing Critical New Data to ForecastersUsed in Weather satellites
- Space Weather Observations at L1 to Advance Readiness (SOLAR-1)Used in Orbits, The Sun
NASA Space Station Blog 12
- Advanced Health Research Begins Week as Station Awaits Crew-13 MissionUsed in Life in orbit
- Astronauts Complete Spacewalk for Solar Array ModificationsUsed in Life in orbit
- Crew Biology Research, Spacecraft Cargo Jobs Kick Off Week on StationUsed in Life in orbit
- ESA, NASA Astronauts Complete Navigation and Science Spacewalk Outside StationUsed in Life in orbit
- Expedition 75 is Go for Tuesday’s Navigation and Science Maintenance SpacewalkUsed in Life in orbit
- NASA Astronauts Ready for Thursday SpacewalkUsed in Life in orbit
- NASA, ESA Astronauts Wrap Up Station SpacewalkUsed in Life in orbit
- NASA, ESA Spacewalkers Finish Installing High-Speed AntennaUsed in Life in orbit
- Spacesuits, Exercise, and Cargo Ops Wrap Week Aboard StationUsed in Life in orbit
- Station Crew Cleans Up, Relaxes After Busy Month of SpacewalksUsed in Life in orbit
- Station Prepares to Welcome Crew-13 while Continuing Space ResearchUsed in Life in orbit
- Week Ends With Soldering, Lunar Simulations, and Cargo Mission PrepsUsed in Life in orbit
U.S. Government Accountability Office 11
- Global Positioning System: Better Planning and Coordination Needed to Improve Prospects for Fielding Modernized Capability (GAO-18-74)Used in GPS
- GPS Modernization: Delays Continue in Delivering More Secure Capability for the Warfighter (GAO-24-106841)Used in GPS
- GPS: Actions Needed to Address Ground System Development Problems and User Equipment Production Readiness (GAO-15-657)Used in GPS
- James Webb Space Telescope: Integration and Test Challenges Have Delayed Launch and Threaten to Push Costs Over Cap (GAO-18-273)Used in Hubble, Webb and Roman
- James Webb Space Telescope: Project Meeting Commitments but Current Technical, Cost, and Schedule Challenges Could Affect Continued Progress (GAO-14-72)Used in Hubble, Webb and Roman
- James Webb Space Telescope: Project Nearing Completion, but Work to Resolve Challenges Continues (GAO-21-406)Used in Hubble, Webb and Roman
- Low-Earth Orbit: NASA Faces Impending Decisions for Replacing International Space Station with Commercial Stations (GAO-26-107805)Used in Commercial stations, ISS, Life in orbit
- NASA Commercial Crew Program: Plan Needed to Ensure Uninterrupted Access to the International Space Station (GAO-18-476)Used in Falcon 9
- Weapon Systems Annual Assessment: DOD Leaders Should Ensure That Newer Programs Are Structured for Speed and Innovation (GAO-25-107569): GPS IIIF and OCXUsed in GPS
- Weapon Systems Annual Assessment: Requiring Mature Technologies Could Enable Shift to Rapid Delivery (GAO-26-108457): GPS IIIF and OCXUsed in GPS
- Weapon Systems Annual Assessment: Updated Program Oversight Approach Needed (GAO-21-222): GPS III Follow-OnUsed in GPS
Congressional Research Service 11
- Landsat 9 and the Future of the Sustainable Land Imaging Program (R46560)Used in Landsat
- Landsat, What’s Next? (IN12281)Used in Landsat
- NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2021 request)Used in Commercial stations
- NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2022 request)Used in Commercial stations
- NASA Appropriations and Authorizations: A Fact Sheet (R43419, FY2024 and FY2025 request)Used in Commercial stations
- NASA Appropriations and Authorizations: At a Glance (R43419)Used in NASA’s budget
- NASA Appropriations and Authorizations: At a Glance (R43419)Used in Commercial stations, ISS, Hubble, Webb and Roman, Mars, The Sun
- NASA Appropriations and Authorizations: Fact Sheet (R43419, FY2025 request)Used in Commercial stations
- National Oceanic and Atmospheric Administration (NOAA) FY2027 Budget Request and Appropriations (IF13275)Used in Weather satellites
- NOAA’s Geostationary Extended Observations (GeoXO) Satellite Program and Issues for Congress (R49026)Used in Weather satellites
- The U.S. Geological Survey (USGS): FY2027 Budget Request (IF13205)Used in Landsat
GPS.gov 9
- Control SegmentUsed in GPS
- GPS AccuracyUsed in GPS
- GPS and Telling TimeUsed in GPS
- GPS ModernizationUsed in GPS
- GPS Timing and Precision InstrumentsUsed in GPS
- New Civil SignalsUsed in GPS
- Program FundingUsed in GPS
- Space SegmentUsed in GPS, Orbits
- What Can GPS Do?Used in GPS
NASA History Office 9
- A Brief History of NASAUsed in Apollo, The birth of NASA, The Space Shuttle
- Apollo: A Retrospective Analysis (Monographs in Aerospace History 3)Used in The builders, Apollo
- Columbia Accident Investigation Board SynopsisUsed in The Space Shuttle
- ISS20th: High-Flying ConstructionUsed in ISS
- Moonport: A History of Apollo Launch Facilities and Operations (NASA SP-4204)Used in Spaceports
- National Aeronautics and Space Act of 1958 (Unamended)Used in The builders, The birth of NASA
- Sputnik and the Origins of the Space AgeUsed in The birth of NASA
- The Decision to Go to the Moon: President John F. Kennedy’s May 25, 1961 Speech before a Joint Session of CongressUsed in The birth of NASA
- The Flight of STS-1Used in The Space Shuttle
SpacePolicyOnline 8
- House Appropriators Reject Deep Cuts to NASA in FY2027Used in NASA’s budget, Commercial stations
- House Clears FY2027 CR, Now to the PresidentUsed in Landsat, Weather satellites, NASA’s budget, Hubble, Webb and Roman, Mars, The outer planets, The Sun
- NASA Agrees with Industry, Keep CLD Program As IsUsed in Commercial stations
- NASA: ISS Deorbit Vehicle Will Cost $1.5 Billion, but It’s EssentialUsed in ISS
- Russia Agrees to ISS Operations, Seat-Swaps, Through 2030Used in ISS
- Starship Achieves Orbit for the First TimeUsed in Starship
- Trump FY2027 NASA Budget Supports Moon Missions, But Cuts Everything ElseUsed in Gateway
- Trump Megabill Includes Billions for Artemis, ISS, Moving a Space Shuttle to Texas and MoreUsed in Gateway
NASA Commercial Low Earth Orbit Development Program 8
- NASA Adjusts Agreements to Benefit Commercial Station DevelopmentUsed in Commercial stations
- NASA Helps with Progress on Vast’s Haven-1 Commercial Space StationUsed in Commercial stations
- NASA Partners Combine Efforts for Low Earth Orbit Commercial StationUsed in Commercial stations
- NASA Seeks Industry Input on Next Phase of Commercial Space StationsUsed in Commercial stations
- NASA Sees Key Progress on Starlab Commercial Space StationUsed in Commercial stations
- NASA Sees Progress on Blue Origin’s Orbital Reef Design DevelopmentUsed in Commercial stations
- NASA Supports Burst Test for Orbital Reef Commercial Space StationUsed in Commercial stations
- NASA, Axiom Space Change Assembly Order of Commercial Space StationUsed in Commercial stations
NASA Glenn Research Center, Beginner’s Guide to Aeronautics 7
- Booster Staging InteractiveUsed in How rockets reach orbit
- Flight to OrbitUsed in How rockets reach orbit
- Ideal Rocket EquationUsed in How rockets reach orbit
- Mass RatiosUsed in How rockets reach orbit
- Rocket ThrustUsed in How rockets reach orbit
- Specific ImpulseUsed in How rockets reach orbit
- Structural SystemUsed in How rockets reach orbit
NASA Marshall Space Flight Center 5
- Cryogenic Fluid Management fact sheet (FS-2023-078-133-MSFC)Used in Refilling in orbit
- NASA Tests New Device for Future In-Space Refueling MissionsUsed in Refilling in orbit
- NASA, Industry Prepare Cryogenic Fuel Technology DemoUsed in Refilling in orbit
- NASA’s Human Landing System Program: Progress Toward Artemis III and Beyond (IAC-24.B3.1.11)Used in Blue Moon, Refilling in orbit, Starship HLS
- Stay Cool: NASA Tests Innovative Technique for Super Cold Fuel StorageUsed in Refilling in orbit
Vast 5
- Vast Advances Haven-1 Into Integration PhaseUsed in Commercial stations
- Vast Announces the Haven-1 and Vast-1 MissionsUsed in Commercial stations
- Vast Secures $500M in Funding to Accelerate Production of Haven Space StationsUsed in Commercial stations
- Vast Secures Agreement with NASA to Test Haven-1 Flight Vehicle at Armstrong Test FacilityUsed in Commercial stations
- Vast Selected by NASA for Sixth Private Astronaut Mission to International Space StationUsed in Commercial stations
NASA Scientific Visualization Studio 4
USGS 4
Presidential Commission (Rogers Commission) 4
- Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. IV: The Cause of the AccidentUsed in The Space Shuttle
- Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. V: The Contributing Cause of the AccidentUsed in The Space Shuttle
- Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. VIUsed in The builders, The Space Shuttle
- Report of the Presidential Commission on the Space Shuttle Challenger Accident, vol. 1, ch. VIII: Pressures on the SystemUsed in The Space Shuttle
NASA Kennedy Space Center 4
- Apollo’s Lunar Module Bridged Technological Leap to the MoonUsed in Apollo
- Flights of Atlantis (OV-104) (NASA Facts FS-2011-06-135-KSC)Used in The Space Shuttle
- Gemini Pioneered the Technology Driving Today’s ExplorationUsed in Mission operations, Mercury & Gemini
- Growing Plants in SpaceUsed in Life in orbit
NASA/JPL 4
USGS EROS Center 3
NASA Goddard Scientific Visualization Studio 3
NOAA 3
NASA Science 3
SpaceX 3
Aerospace America 3
NASA Goddard Space Flight Center 3
NASA Johnson Space Center 3
NASA/JPL-Caltech 3
NOAA Space Weather Prediction Center 3
- Electric Power TransmissionUsed in The Sun
- Geomagnetic StormsUsed in The Sun
- Satellite DragUsed in The Sun
Federal Aviation Administration 2
Government Accountability Office 2
- A Glossary of Terms Used in the Federal Budget Process (GAO-05-734SP)Used in NASA’s budget
- NASA: Assessments of Major Projects (GAO-26-108556)Used in The builders, NASA’s budget, New Glenn & Vulcan, Space Launch System, Starship, The Artemis plan, Blue Moon, Gateway, Orion, Refilling in orbit, Starship HLS
NASA Jet Propulsion Laboratory 2
Office of Management and Budget 2
The Planetary Society 2
SpaceNews 2
NASA Johnson Space Center Procurement 2
Payload 2
NASA Space Station Research Integration Office 2
GPS.gov (National Coordination Office for Space-Based Positioning, Navigation, and Timing) 1
U.S. Space Force, Space Systems Command 1
NOAA National Ocean Service 1
U.S. Space Force 1
NASA Space Communications and Navigation 1
Breaking Defense 1
Office of the Under Secretary of Defense (Comptroller) 1
Office of Space Commerce, U.S. Department of Commerce 1
NASA Landsat Science 1
U.S. Department of the Interior 1
House Committee on Appropriations 1
NASA Earth Observatory 1
U.S. Geological Survey 1
NOAA NESDIS and NASA Space Place 1
NASA Orbital Debris Program Office 1
- Frequently Asked QuestionsUsed in Orbits
NASA Image and Video Library 1
CSU/CIRA and NOAA, CIRA Satellite Library 1
House Committee on Science, Space, and Technology, Subcommittee on Environment 1
USAspending.gov (U.S. Department of the Treasury) 1
NASA Space Communications and Navigation (SCaN) 1
Jonathan McDowell 1
United Launch Alliance 1
Phys.org 1
U.S. Congress 1
NASA Artemis Blog 1
NASA Advanced Supercomputing Division 1
Space.com 1
NASA Watch 1
Astronomy 1
Cosmic Log 1
NASA Technical Reports Server 1
European Spaceflight 1
Gulf News 1
NASA Space Technology Mission Directorate 1
FLYING, via Astronomy 1
Starlab Space 1
NASA, Office of the Administrator 1
Center for Strategic and International Studies 1
NASA Johnson Space Center Office of Procurement 1
NASA Human Research Program 1
NASA Marshall Space Flight Center (NASA Technical Reports Server) 1
U.S. Senate Committee on Appropriations 1
No source matches that filter.